CASE STUDY

PUTNAM NORTH SMALL

GYMNASIUM

CMU & Tile Surface Repainting

LOCATION

11800 N Rockwell Ave,Oklahoma City, OK 73162

CLIENT

Lingo Construction

PROJECT OVERVIEW

A New Gymnasium Color Scheme Built for High-Traffic Durability

DRL Coatings completed the preparation and repainting of existing CMU and tile surfaces throughout the Putnam North Small Gymnasium in Oklahoma City.

The project included approximately 6,500 SF of existing CMU and tile walls, along with painting of hollow metal doors and frames, to introduce a new color scheme throughout the gymnasium.

Because tile surfaces along the lower walls are exposed to frequent contact and high-traffic use, the project required careful surface preparation and a coating approach capable of providing reliable adhesion and long-term durability.

CMU & Tile Walls

6,500 SF

Preparation and repainting of existing gymnasium wall surfaces.

High-Traffic Areas

Existing Tile

Surface preparation and coating system for lower wall tile.

Doors & Frames

Hollow Metal

Painting of existing hollow metal doors and frames.

THE CHALLENGE

Adhesion on Existing Tile

The primary challenge was achieving proper paint adhesion and long-term durability on the existing wall tile located along the lower portion of the gymnasium.

Because these surfaces are exposed to a high-traffic environment, the coating system needed to perform reliably on the existing tile while providing a durable finish capable of handling frequent use.

OUR SOLUTION

Surface-Specific Preparation & Coating

DRL Coatings evaluated and properly prepared the existing CMU walls and tile surfaces before painting.

A coating system specifically suited for the existing tile was selected to provide strong adhesion and increased durability in the high-traffic lower wall areas.

The work was also carefully coordinated to create a consistent color transition and uniform finish across both CMU and tile surfaces throughout the gymnasium.

THE RESULT

DRL Coatings successfully completed the gymnasium color change while achieving proper adhesion and a durable finish on the existing tile surfaces.

The finished project provided a uniform and consistent appearance across both CMU and tile walls and was completed safely and according to schedule.

COLOR CHANGE

New color scheme successfully completed

DURABLE FINISH

Proper adhesion achieved on existing tile

ON SCHEDULE

Project completed according to plan

PROJECT GALLERY

Visual documentation.

INTERIOR PAINTED CMU WALLS & TILE
MULTIPLE COLOR SCHEME
CMU WALLS & TILE
CMU WALLS

“Proper surface preparation and a coating system selected specifically for the existing tile helped deliver a consistent finish designed for the demands of a high-traffic gymnasium.”