CASE STUDY

AFFORDABLE DENTURES

OKC

Interior Painting & Surface Preparation

LOCATION

2209 Interstate 240 Service Rd, Suite 315

CLIENT

Corco Construction

PROJECT OVERVIEW

Completing Interior Painting Without Disrupting Daily Clinic Operations

DRL Coatings completed interior painting and surface preparation work for Affordable Dentures in Oklahoma City.

The project included approximately 14,000 SF of gypsum walls and ceilings, 1,000 SF of existing ceiling grid, and painting systems for hollow metal doors and frames using Sherwin-Williams coatings.

Because the clinic remained operational during normal business hours, the work had to be carefully scheduled and executed during nighttime hours, with each area completed, cleaned, and ready for use by the following day.

Walls & Ceilings

14,000 SF

Painting system for gypsum walls and ceilings.

Ceiling Grid

1,000 SF

Painting system for the existing acoustic ceiling grid.

Doors & Frames

Hollow Metal

Painting system for hollow metal doors and frames.

THE CHALLENGE

Night Work in an Active Clinic

The primary challenge was completing the interior painting scope during nighttime hours while maintaining the required project schedule.

The work also had to be performed with minimal disruption to the clinic’s daily operations, while protecting existing finishes, equipment, and occupied areas.

OUR SOLUTION

Carefully Planned Nighttime Execution

DRL Coatings carefully planned and performed the work during nighttime shifts to avoid interfering with normal clinic operations.

Each work area was closely coordinated to maintain productivity, protect existing finishes and equipment, and ensure the spaces were clean, complete, and ready for use the following day.

THE RESULT

The project was successfully completed within the required schedule while allowing the clinic to continue operating without disruption during normal business hours.

Each work area was completed, cleaned, and returned to service after every night shift, with consistent, high-quality finishes throughout the designated areas and zero safety incidents.

 

ON SCHEDULE

Project completed within the required timeline

0

Safety Incidents

NO DISRUPTION

Clinic operations continued during business hours

PROJECT GALLERY

Visual documentation.

INTERIOR PAINTED GYPSUM WALLS
CEILING GRID
ACCENT WALLS
ACCENT WALLS
ACCENT WALLS
GYPSUM WALLS
GYPSUM WALLS

“Careful nighttime planning allowed DRL Coatings to complete the painting scope while keeping the clinic fully operational during normal business hours.”