CASE STUDY

SHAWNEE PUBLIC

SCHOOLS

Drywall Finishing, Interior & Exterior Painting

LOCATION

1401 E Independence St, Shawnee, OK.

CLIENT

WYNN Construction

PROJECT OVERVIEW

Coordinating Multiple Painting Scopes in an Active Construction Environment

DRL Coatings completed drywall finishing, interior painting, and exterior painting work for Sequoya Elementary in Shawnee, Oklahoma.

The project included approximately 5,000 SF of tape and bed work, 46,200 SF of CMU wall painting, coatings for steel railings and columns, and multiple exterior scopes including EIFS walls and soffits, fascia, gutters, and downspouts.

Because several trades were working simultaneously in the same areas, the project required constant coordination and careful sequencing to maintain productivity and keep the overall construction schedule on track.

CMU Walls

46,200 SF

Painting system applied throughout interior CMU wall surfaces.

Drywall Finishing

5,000 SF

Tape and bed system for walls and ceilings.

EIFS Exterior

2,600 SF

Painting system for exterior EIFS walls and soffits.

THE CHALLENGE

Multiple Trades, Shared Work Areas

The primary challenge was maintaining a tight project schedule while multiple trades worked simultaneously in the same areas.

This required constant coordination to preserve crew productivity, access to work areas, and construction progress without creating delays for DRL Coatings or other contractors on site.

OUR SOLUTION

Coordinated Manpower & Scheduling

DRL Coatings utilized adequate manpower and closely coordinated daily activities with the other trades working on site.

Careful sequencing allowed the crews to move efficiently between interior and exterior scopes while avoiding interference with ongoing construction activities and maintaining the required project schedule.

THE RESULT

The project was successfully completed and delivered on schedule, with consistent, high-quality finishes throughout the completed work.

DRL Coatings successfully coordinated multiple exterior scopes—including EIFS, fascia, gutters, and downspouts—while completing the project with zero safety incidents.

ON SCHEDULE

Project completed and delivered as planned

0

Safety Incidents

MULTI-SCOPE

Exterior scopes successfully coordinated and completed

PROJECT GALLERY

Visual documentation.

METAL SOFFITS & EIFS SOFFITS
VERTICAL EIFS FASCIA
VERTICAL METAL FASCIA
DOWNSPOUTS & GUTTERS
MULTIPLE WALL COLOR
GYPSUM WALLS & CMU
STEEL METAL RAILING

“Close coordination with multiple trades allowed DRL Coatings to maintain productivity, complete several interior and exterior scopes, and deliver the project on schedule.”