CASE STUDY

TAHLEQUAH PUBLIC

SCHOOLS

Middle School Band & Cafeteria Expansion

LOCATION

871 Pendleton St., Tahlequah, OK 74464

CLIENT

TRIGON General Contractors & Construction Manager, Inc.

PROJECT OVERVIEW

A Full Interior Painting Scope Delivered Ahead of the School-Year Deadline

DRL Coatings completed the interior painting and high-performance coating scope for the Middle School Band & Cafeteria Expansion at Tahlequah Public Schools.

The project included approximately 9,250 SF of gypsum walls, 10,600 SF of acoustic ceiling grid, 8,500 SF of CMU walls, and coatings for approximately 80 hollow metal doors and 70 hollow metal frames.

The work utilized multiple Sherwin-Williams coating systems, including ProMar 200 Eggshell, Pro Industrial Pre-Catalyzed Waterbased Epoxy, and Pro Industrial Waterbased Alkyd Urethane, all within a demanding one-month construction schedule.

Gypsum Walls

9,250 SF

Interior painting system for new gypsum wall surfaces.

Acoustic Ceiling Grid

10,600 SF

Painting system applied throughout the acoustic ceiling grid.

CMU Walls

8,500 SF

High-performance coating system for CMU wall surfaces.

THE CHALLENGE

School-Year Deadline

The primary challenge was completing the entire painting scope within a demanding one-month schedule and having the facility ready before the beginning of the school year.

The accelerated timeline also required DRL Coatings to work around and coordinate with multiple active trades while maintaining consistent production and quality finishes throughout the project.

OUR SOLUTION

Continuous, Coordinated Production

DRL Coatings mobilized a dedicated 4-painter crew and maintained continuous production throughout the project.

Close coordination with the general contractor and other trades allowed the crew to maximize efficiency, maintain quality control, and keep each phase of the painting scope moving ahead of the required schedule.

THE RESULT

DRL Coatings successfully completed the entire painting scope approximately one week before the start of school, meeting the project requirements while delivering consistent, quality finishes throughout the expanded facility.

WEEK EARLY

Completed ahead of the school-year deadline

FULL SCOPE

Painting and coating work successfully completed

OPENING READY

Facility completed before students returned

PROJECT GALLERY

Visual documentation.

INTERIOR CMU WALLS
INTERIOR GYPSUM WALLS
ACCENT PAINTED COLUMNS
PAINTED CEILING GRID
INTERIOR GYPSUM WALLS
INTERIOR CMU WALLS
INTERIOR WOOD PANELING

“Careful coordination and continuous production allowed the full painting scope to be completed ahead of schedule while maintaining consistent quality throughout the facility.”